Select Page

Starting Monday, September 21st the City of Eaton Rapids will begin construction on State Street. The construction project is set to last from September 21st through mid-November. The construction will start on the east side of the State Street bridge at Main and end at John B Davison Dr. The route will be closed to through traffic and only open to local traffic. Residents who live on this route will still be able to access their homes and driveways. Through traffic will need to utilize the posted detour taking Smithville as a detour around the construction site. We thank you for your patience during this construction season and look forward to opening the road as soon as possible.